A footman
Concept was done in a day. Modeling and UV to follow will be for one day. Texturing and Rigging each for one day. Animation sequences: idle, attacks, walk, run, special move will all be done with minimal frames--6 to 15 frames. Maximum time to finish the animations is half a day for each 15-frame animation.